ODERBRÜCKE PROJECT INSIGHT (1/4)

Introduction

The new Oder Bridge at Küstrin-Kietz represents a landmark achievement in modern bridge engineering, marking the world’s first use of carbon fiber-reinforced polymer (CFRP) hangers in a railway bridge. This cutting-edge infrastructure project not only replaces the aging single-track steel truss bridge from 1926, but it also sets a new standard in the design of railway bridges, blending advanced materials with innovative construction techniques to create a much more efficient, sustainable, and future-ready solution.

At the heart of this groundbreaking structure are the CFRP hangers, which were meticulously designed and manufactured in Switzerland by Carbo-Link AG, a leader in the innovation of advanced composite materials. These hangers are a significant departure from traditional steel components, offering a range of advantages that contribute to the overall performance and longevity of the bridge. CFRP is lighter, more durable, and more resistant to fatigue than steel, making it the ideal choice for the demands of the Oder Bridge project. The outstanding fatigue resistance of CFRP was one of the driving factors in the decision to use it, as the bridge’s design could not have been achieved with conventional steel hangers. For this reason, CFRP was not simply an improvement over existing materials; it was an essential necessity for meeting the rigorous engineering and performance requirements.

In addition to its impressive structural properties, the use of CFRP brings substantial benefits in terms of maintenance. The new bridge will require less upkeep over its lifespan compared to its steel counterparts, helping to lower long-term costs and reduce disruptions to railway operations. This makes the Oder Bridge not only an engineering marvel but also a highly efficient and cost-effective solution for modernizing railway infrastructure.

Project Specifications

Spanning a total length of 266 meters, the Oder Bridge is a feat of both aesthetic and engineering excellence. The most striking feature of the bridge is its 130-meter-long network arch, which gracefully crosses the Oder River, creating a visually appealing and highly efficient structure. The network arch is a key design element, serving both functional and aesthetic purposes, while providing the necessary strength and stability for the bridge. Its sweeping lines and sleek form enhance the visual character of the surrounding landscape, contributing to the bridge’s iconic appearance.

On the Polish side, the bridge continues with a three-span viaduct, which seamlessly integrates the bridge into the existing rail network. This section of the bridge is designed to ensure smooth and continuous rail traffic flow, while also adapting to the local topography and environmental conditions. The viaduct’s design addresses the challenges posed by the terrain, ensuring that the bridge remains resilient and functional for years to come.

On the German side, a 176-meter-long floodplain bridge completes the crossing, further ensuring the structural integrity of the entire system. The floodplain bridge has been specifically designed to meet the unique environmental challenges of the region, allowing it to adapt to varying water levels and protect the bridge from potential flood damage.

Together, these elements combine to create a highly efficient and resilient piece of infrastructure that is capable of supporting the increasing traffic loads of the modern railway network. The Oder Bridge is not only a critical link in the international rail connection between Germany and Poland but also plays a crucial role in enhancing cross-border mobility within the European transport network.

Stay tuned for the next parts of this story, where we will share more details on the Oder Bridge project, including its design, testing, and the innovative use of CFRP materials.