Innovative Strengthening of a Damaged Column Head near Paris
In a supermarket close to Paris, engineers discovered severe cracks and spalling at a column head (capital). The structural capacity was compromised, and urgent strengthening was required to prevent further damage and ensure safety.
The Problem:
Cracked concrete made bonded reinforcement plates ineffective.
The system needed to actively confine the column, close existing cracks,
and restore load capacity sustainably.
Tight construction space ruled out traditional post-tensioned steel bars.
The Solution: CL-RESTRAP
The engineering firm Savae selected Carbo-Link’s CL-RESTRAP system — a high-strength CFRP strap with active post-tensioning.
Custom straps and deviation saddles were manufactured to match the measured perimeter.
Technicians received targeted on-site training for proper stressing tool use.
Despite limited access, the lightweight strap was easily threaded through a narrow gap and post-tensioned horizontally with 8 t load.
The Result:
Cracks visibly closed.
The column’s capacity was restored within minutes.
The supermarket was able to safely resume operations.
“We were thoroughly impressed by the system. Other engineers had told us it couldn’t be done. With CL-RESTRAP, we managed not only to close the cracks, but also to thread the strap through a very narrow opening. The installation was straightforward, and the prestressing process was completed within minutes.”
— Ludovic Moreno, Lead Engineer at Savae
Key Benefits of CL-RESTRAP:
Active confinement & crack closure
Reliable strengthening in confined spaces
Rapid and straightforward installation
Durable, sustainable solution
This project shows how CFRP post-tensioning can succeed where conventional techniques reach their limits.