Carbo-Link
Structural CFRP tension members and tubes since 2001

Insights

MAIN MAST STEPPING FOR PERINI NAVI KETCH 'SYBARIS' IN LA SPEZIA

Our technicians are putting the finishing touches on the main mast of Perini Navi's latest launch.

  • Reacher stay - 72m in length with a 230mm diameter foil.
  • Blade stay - 68m in length with a 215mm diameter foil.
  • Discontinuous laterals.
  • Backstay. 
  • Flexible runner cables - in collaboration with BSI. 

The mizzen mast was stepped successfully soon after the boat left the shed. 

  • Discontinuous laterals.
  • Split forward stay. 
  • Kevlar running backstays.
James Wilkinson